- This topic has 1 reply, 2 voices, and was last updated 1 year, 9 months ago by Will Barron.
-
AuthorPosts
-
Dec 14, 2022 #7510375Email Draft (to ideal client: contractors)Lysmuna KhouwParticipantDec 14, 2022
SUBJECT LINE:
WERKST IS HERE TO GET RID OF YOUR DOCK LEVELLER PIT PROBLEM!Hi!
Werkst is the sole distributor of Loading Systems Dock Leveller from Netherlands.
We use a floating dock leveller system in which you do not need to make a closed system pit.
Heres the picture below.<<<<<<<<<<<<<>>>>>>>>>>>>>>>>>
And, oh yeah, we also provide all drawings and we will check the pit before concrete pouring so there is absolutely no more room for error
Can we setup a call or a meeting so we can discuss if this will be useful to you?Sincerely,
LysmunaDec 15, 2022 #7510381Will BarronKeymasterDec 15, 2022Will Barron Dec 15, 2022Sent to contractors:
SUBJECT LINE: [name] – On going factory projects?
Hi [name],
Are you tired of building leveller pits for your customers?
Our dock leveller system doesn’t require a pit for installation.
We handle all the concrete pouring so there’s no room for error.
Would it make sense to jump on a quick call to see if we can speed up your next project?
Sincerely,
Lysmuna
—–
Hi [name],
Getting the clients leveller solution slightly off can cause big headaches later on.
Our dock leveller system doesn’t require a pit for installation.
We handle all the concrete pouring so there’s no room for error.
Would it make sense to jump on a quick call to see if we can speed up your next project?
Sincerely,
Lysmuna
—
-
AuthorPosts
- You must be logged in to reply to this topic.